午夜精品一区二区三区av,7777精品伊人久久久大香线蕉完整版,亚洲三级欧美,国产精品免费看一区二区三区

location: Home >  English > News

Guangzhou’s first metro loop line 11 operated with 26 transfer stations

12/30/2024 Source: cnbayarea.org.cn

Share: 

On Dec 28, Guangzhou's first metro loop line, Line 11, officially began its initial operation. On the same day, the Guangqing Intercity Railway extension (from Qingcheng Station to Feixia Station) was also launched. 

1 戴博思 拍攝

Guangzhou metro loop Line 11 is marked in gold.

The opening ceremony for Line 11 was held at Caihong Bridge Station in the morning, with nearly 200 representatives of builders and citizens taking the first train together.

Line 11 is approximately 44.2 kilometers long, with a total of 31 stations all underground. Among them, there are 26 transfer stations, and 14 of them will interchange with existing lines at the beginning of the operation. The opening of Guangzhou Railway Station and Guangzhou East Railway Station has been delayed. The line passes through five central districts of Guangzhou, namely Tianhe, Baiyun, Yuexiu, Liwan, and Haizhu, connecting four major hubs: Pazhou, Guangzhoudong Railway Station, Guangzhou Railway Station, and Bai'etan (Fangcun).

The trains are designed for driverless operation and run at 80 km/h. Line 11 does not have a starting station and terminal; the first train will start from multiple stations. The whole round trip takes about 75 minutes each way, with only two yuan as the fare rate. Some trains will end at Longtan Station or Chisha Station as temporary terminals during the low peak period of passenger flow.

2 戴博思 拍攝

Decoration in the Guangzhou University of Chinese Medicine Station

The overall decoration styles of the stations are themed based on intangible cultural heritage, such as Cantonese Opera, Guangdong Embroidery, Guangdong Colored Porcelain, Guangdong Lion Dance, Guangdong Sculpture, and Traditional Medicine, highlighting the characteristics of Lingnan culture.

The construction difficulty, scale, and construction risk challenges of this line are also considered the most significant in Guangzhou Metro's history. The line crosses the Pearl River three times, passes through public parks five times, crosses railways nine times, and goes under or beside elevated roads or metro tunnels 12 and 9 times, respectively.

In terms of rail transit construction models, standards, and the application of new technologies, it has created nearly 12 domestic initiatives or Guangdong initiatives, and has currently obtained 8 provincial and ministerial-level construction methods and 35 patents.

3 戴博思 拍攝

Guangzhou Metro Line 11

The total metro and intercity railway mileage in the Greater Bay Area operated by Guangzhou Metro surpassed 1,000 kilometers, with 705.1 kilometers of metro and 338.3 kilometers of intercity railway. Guangzhou Metro plans to open 10 new lines (sections) totaling 173 kilometers of routes next year.


主站蜘蛛池模板: 芦山县| 隆德县| 黄石市| 九龙县| 托克逊县| 承德市| 吉林市| 木里| 潼南县| 青铜峡市| 光山县| 通榆县| 金川县| 文成县| 定西市| 鸡泽县| 榆社县| 胶州市| 麻城市| 珠海市| 监利县| 五大连池市| 龙里县| 富源县| 宿州市| 调兵山市| 沁水县| 体育| 汝阳县| 巴南区| 万盛区| 同德县| 封丘县| 施秉县| 敦化市| 略阳县| 麻栗坡县| 哈尔滨市| 盐城市| 高碑店市| 仙居县|